0

Load the container and arrange transportation

Make the reservation and loading into the warehouse, provide the invoice and packing list, save the tracking number, and update the goods status in time.

Price Interview

Price Interview

Load the container and arrange transportation

Interview

Select the number of specifications

Please check the product information you want!

Product Detail

1. Pre-loading Preparation (1–3 Days Before Loading)

    1.1 Receive the Shipping Order (S/O) from the forwarder.

    1.2 Check goods quantity and documents,Verify cartons, gross weight, net weight, volume.

    1.3 Confirm loading date, address and driver contact information.

    1.4 Prepare finished goods and loading accessories: forklift, pallets, stretch film, air bags. 

2.Empty Container Inspection (On-site Check)

    Verify container number and truck license plate to match the S/O record----Inspect the container interior and exterior carefully for damage----Take standard photos for record

3. Official Container Loading Operation,Core Loading Principles.

    Load goods from the innermost side to the container door---- Fill all gaps with air bags or wooden blocks---- Special cargo handling----Take photos during half loading process for loading record

4. Final Checking & Container Sealing.

    Count total cartons on site to ensure consistency with packing list quantity before sealing----Close container double doors and fix the shipping company disposable seal----Take final photos: full loaded container view and close-up of the seal number for file retention

No comment

Product Detail

1. Pre-loading Preparation (1–3 Days Before Loading)

    1.1 Receive the Shipping Order (S/O) from the forwarder.

    1.2 Check goods quantity and documents,Verify cartons, gross weight, net weight, volume.

    1.3 Confirm loading date, address and driver contact information.

    1.4 Prepare finished goods and loading accessories: forklift, pallets, stretch film, air bags. 

2.Empty Container Inspection (On-site Check)

    Verify container number and truck license plate to match the S/O record----Inspect the container interior and exterior carefully for damage----Take standard photos for record

3. Official Container Loading Operation,Core Loading Principles.

    Load goods from the innermost side to the container door---- Fill all gaps with air bags or wooden blocks---- Special cargo handling----Take photos during half loading process for loading record

4. Final Checking & Container Sealing.

    Count total cartons on site to ensure consistency with packing list quantity before sealing----Close container double doors and fix the shipping company disposable seal----Take final photos: full loaded container view and close-up of the seal number for file retention

Load the container and arrange transportation
Make the reservation and loading into the warehouse, provide the invoice and packing list, save the tracking number, and update the goods status in time.
Long press to look detail
Long by picture save/share
Add Successfully

Load the container and arrange transportation

enquiry
Add Successfully

Copyright © 2026-2027 Yiwu Chuanhui Trading Co., Ltd. All Rights Reserved. 

Service Center
Phone Whatsapp
+86 18728321125
Phone Whatsapp
+86 17857186225
E-mail
yhlafee@gmail.com
添加微信好友,详细了解产品
使用企业微信
“扫一扫”加入群聊
复制成功
添加微信好友,详细了解产品
我知道了